Water Supply and Sewerage Department
Department Head |
Mobile Phone |
|
Sharad Nanegaonkar (Executive Engineer) |
Extn. 234 / 8422811413 |
Introduction: |
The Mira-Bhayander Municipal Corporation has been sanctioned the following water reservation: A) STEM Authority – 86 MLD (Million Liters per Day) B) MIDC (Maharashtra Industrial Development Corporation) – 125 MLD Total – 211 MLD Out of the sanctioned quota, 86 MLD is being supplied by the STEM Authority, and 110 to 112 MLD is supplied by MIDC, resulting in a total supply of 196 to 198 MLD. As per the current population, the required water supply is 215 MLD.
From the year 2011, new tap connections in the city have been stopped. After the commencement of the 75 MLD scheme, the issuance of new tap connections has resumed.
|
regarding the Surya Project Water Supply Scheme and Mira-Bhayandar Municipal Corporation's Underground Sewerage Scheme (Phase-2 under AMRUT 2.0 Mission): Regarding the Surya Project Water Supply Scheme • The approved and existing water quota for Mira-Bhayandar Municipal Corporation is as follows:
|
Development Works:-1. Augmented Main Water Pipelines and Distribution System Based on the Surya Regional Water Supply Scheme
2. Mira Bhayandar Municipal Corporation Underground Drainage Scheme Phase-2 (Part-1)
3. Mira Bhayandar Municipal Corporation Underground Drainage Scheme Phase-2 (Part-2)
|
MIRA BHAYANDAR MUNICIPAL CORPORATION Underground Sewerage Scheme Details of Sewerage Treatment Plant
Sewerage Treatment Plant Under Construction
STP under construction - JNNURM - 08 MLD STP under construction - Amrut 2.0 - 48 MLD Total STP Capacity Under Construction - 56 MLD |
Citizen Charter: |
Sr. No. |
Service Description |
Name & Designation of Service Officer |
Prescribed Time Limit for Service |
Name & Designation of Higher Officer for Complaints if Service is Delayed |
1 |
Direct contact at Mira-Bhayandar Municipal Corporation HQ for water supply complaints |
Clerk / Junior Engineer |
During office hours |
Executive Engineer |
2 |
Stopping leakage in main water pipeline |
Junior Engineer |
3 days |
Executive Engineer |
3 |
Complaints regarding contaminated water |
Junior Engineer |
Within 7 days |
Executive Engineer |
4 |
Complaints about irregular or low-pressure water supply |
Junior Engineer |
7 days |
Executive Engineer |
5 |
Complaints regarding water bills |
Clerk / Junior Engineer |
Within 7 days |
Executive Engineer |
6 |
Complaints regarding water bills (received by post) |
Clerk / Junior Engineer |
Within 7 days |
Executive Engineer |
7 |
Office to record water usage after meter inspection |
Clerk |
Once in 4 months |
Executive Engineer |
8 |
Issuance of water bill |
Clerk |
Once in 4 months |
Executive Engineer |
9 |
Issuance of domestic water bill |
Clerk |
Once in 4 months |
Executive Engineer |
10 |
Application for copy of bill |
Clerk |
Within 3 days of application and payment of fees |
Executive Engineer |
11 |
Disconnection of water connection on applicant's request |
Clerk / Junior Engineer |
Within 7 days after application and payment of dues |
Executive Engineer |
12 |
Issuance of disconnection order |
Clerk / Junior Engineer |
Within 3 days of approval |
Executive Engineer |
13 |
Issuance of no dues certificate |
Clerk / Junior Engineer |
Within 7 days of disconnection order |
Executive Engineer |
14 |
Restoration of water supply disconnected due to non-payment |
Clerk / Junior Engineer |
Within 3 days of payment |
Executive Engineer |
15 |
Acceptance and acknowledgment of water connection application |
Clerk |
During office hours |
Executive Engineer |
16 |
Informing applicant of deficiencies in the application |
Clerk |
Within 7 days |
Executive Engineer |
17 |
Approval of connection after submission of complete documents |
Clerk / Junior Engineer |
Within 10 days after document verification |
Executive Engineer |
18 |
Pipeline connection and road cutting permission |
Junior Engineer |
Within 15 days after payment to Municipal Corporation |
Executive Engineer |
19 |
Burst or clogged water pipeline |
Junior Engineer |
Within 48 hours |
Executive Engineer |
20 |
Water pipeline repair |
Junior Engineer |
Within 3 days of complaint |
Executive Engineer |
21 |
Borewell repair |
Junior Engineer |
Within 15 days of complaint |
Executive Engineer |
22 |
Cleaning and repairing of public wells |
Junior Engineer |
Within 15 days of proposal approval |
Executive Engineer |
23 |
Laying of new pipelines |
Junior Engineer |
Within the time mentioned after proposal approval |
Executive Engineer |
24 |
Collection of water samples |
Supervisor (Mistri) |
Daily |
Executive Engineer |
25 |
Transfer of water connection |
Junior Engineer |
Within 3 days after application and payment of dues |
Executive Engineer |
26 |
Repair of water connection |
Junior Engineer |
Within 3 days after application and payment of dues |
Executive Engineer |
27 |
Name change on water bill |
Clerk |
Within 30 days |
Executive Engineer |
28 |
Water tanker supply in case of interruption in regular supply |
Junior Engineer |
Within 48 hours |
Executive Engineer |
29 |
Water tanker supply for events |
Junior Engineer |
4 days in advance |
Executive Engineer |
Chart - Mira Bhayander Municipal Corporation (MBMC) |
|||||
Sr. No. |
Name of Officer/Employee |
Contact |
Designation |
Category |
Description of Work |
1 |
Mr. Sharad Nanegaonkar |
8422811413 |
Executive Engineer |
Class I |
Supervision of staff and officers in Water Supply Dept. Conduct regular meetings, oversee development works through tenders, attend various committee and govt. authority meetings. |
2 |
Mr. Uttam Randive |
8422811390 |
Deputy Engineer |
Class I |
Supervision of water distribution and sewerage systems in Ward Committees 01 to 06, especially maintenance and repair in Ward Committees 5 and 6. |
3 |
Mr. Arvind Patil |
8422811470 |
Section Engineer |
Class II |
Handles sewer systems and property connections in Ward Committees 1 to 6; water supply maintenance in Committees 5 and 6. |
4 |
Mr. Bhupesh Kakade |
8422811324 |
Section Engineer |
Class II |
Responsible for water supply and sewerage systems in Squad 01 and 02 of the Ward. |
5 |
Mr. Manoj Vishe |
9773060478 |
Junior Engineer |
Class III |
1. Maintenance of all pumping stations in the Water Supply and Sewerage Department. |
6 |
Mr. Mahesh Davale |
9833284301 |
Sr. Clerk |
Class III |
1. Complete 100% water bill recovery target in Ward Committee No. 3 (Golden Nest to Kanakia area). Handle all water bill-related work in Bhayander (East). Record incoming daily mail and distribute it to the concerned officers. Review daily tasks of departmental staff and monitor their work. Check daily receipts, generate recovery reports using computer software, and verify actual collections and bank receipts. Review and finalize ledger entries. Handle daily correspondence. Provide information under RTI within the prescribed time. Manage work related to new water connection approvals, repairs, transfer orders, name changes, and correspondence from Hon. Corporators. Maintain departmental records. Submit weekly reports through the e-Office system. Provide all services related to RTS (Right to Services). |
7 |
Ms. Lalita Jojare |
9029527276 |
Clerk |
Class III |
1. Achieve 100% water tax recovery target in Ward Committee No. 2 area. Handle all water bill-related work in Bhayander (West). Record daily incoming mail and distribute it to the concerned persons. Monitor daily work of departmental employees. Verify daily receipts, generate daily collection reports through the computer system, and reconcile actual collected water taxes with bank receipts. Check and maintain ledger entries. Provide information under RTI within the stipulated time. Handle all work related to new water connection approvals, repairs, transfer orders, name changes, and correspondence from Hon. Corporators. Maintain departmental records. Submit weekly reports via e-Office. Provide all services related to RTS. |
8 |
Mr. Nilesh Patil |
9323779254 |
Clerk |
Class III |
1. Achieve 100% water tax recovery target in Ward Committee No. 1 area. Handle all water billing-related work in this area. Record and distribute daily incoming mail. Review and supervise the work of departmental employees. Verify daily receipts and generate collection reports using the software. Reconcile actual collected water tax amounts with bank challans. Check and maintain ledger entries. Provide information under RTI within the stipulated time. Manage all work related to new water connection approvals, connection repairs, transfer orders, name changes, and correspondence from Hon. Corporators. Maintain departmental records and submit weekly reports via the e-Office system. Provide all services related to RTS. |
9 |
Mr. Vijay Gaikwad |
9920421014 |
Clerk |
Class III |
1. In Ward Committees No. 4 and 5: Record daily incoming mail and distribute it to concerned persons. Monitor and review the daily work of employees. Handle daily correspondence. Provide information under RTI within the prescribed time. Manage all tasks related to new water connection approvals, repairs, transfer orders, name changes, and correspondence from Hon. Corporators and public representatives. Maintain records, submit weekly reports through e-Office, and provide all services related to RTS. |
10 |
Mr. Ravindra Sanap |
9867720149 |
Clerk |
Class III |
1. Ensure 100% water tax collection in Ward Committee No. 6. Handle all work related to water billing in this ward. Record incoming daily correspondence and distribute to concerned persons. Review daily employee performance and supervise their work. Verify daily cash collections, generate daily recovery reports from the computer system, and cross-verify actual collections with bank challans. Verify and maintain ledger entries. Handle daily correspondence. Provide RTI information within the prescribed time. Manage all tasks related to new water connection approvals, repairs, transfer orders, name changes, and correspondence from Hon. Corporators. Maintain records, submit weekly reports through the e-Office system, and provide all RTS-related services. |
11 |
Mr. Anand Dabhade |
9324275370 |
Clerk |
Class III |
1. Ensure 100% water tax collection in Ward Committee No. 4 (Kanakia to Chena). Handle all work related to water billing for this area. Record and distribute daily incoming correspondence. Monitor daily employee performance and supervise their tasks. Verify daily cash collections and extract recovery reports via computer system. Cross-check collections against bank challans. Maintain and verify ledger entries. Manage daily correspondence and provide RTI information within the stipulated time. |
Officer / Designation and Number:- |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Sr. No. |
Officer/Employee Name |
Designation |
Category |
Nature of Work |
1 |
Mr. Srinivas Tele |
Peon |
Class IV |
Peons work in the main office |
2 |
Mr. Anil Kawade |
Peon |
Class IV |
Peons work in the main office |
3 |
Mr. Bhushan Patil |
S.K. |
Class IV |
Peons work in the main office |
4 |
Mr. Vishwanath Patil |
S.K. |
Class IV |
Peons work in the main office |
5 |
Mr. Manvel Mayavan |
S.K. |
Class IV |
Peon work |
6 |
Mr. Rakesh Patil |
S.K. |
Class IV |
Peon work |
7 |
Mr. Chhallan Arumugam |
S.K. |
Class IV |
Peon work |
8 |
Mr. Hitesh Harijan |
S.K. |
Class IV |
Cash counter work in the main office |
9 |
Mr. Kishor Padhir |
S.K. |
Class IV |
Peons work in the main office |
10 |
Mr. Devidas Bhasma |
S.K. |
Class IV |
Peons work in the main office |
List of sanitation workers |
||||
Squad No.1 (Murdha to Uttan) |
||||
Sr. No. |
Officer/Employee Name |
Designation |
Category |
Nature of Work |
1 |
Mr. Mahesh Shan. Tamore |
S.K. |
Class IV |
Mukadam (Supervisor) |
2 |
Mr. Agarvel Kalimurti |
S.K. |
Class IV |
Labor work |
3 |
Mr. Selvaraj Virammuttu |
S.K. |
Class IV |
Labor work |
4 |
Mr. Ambaday Nakilian |
S.K. |
Class IV |
Labor work |
5 |
Mr. Damumani Keshav Naadimulam |
S.K. |
Class IV |
Labor work |
6 |
Mr. Taranchand Nagare |
S.K. |
Class IV |
Valve Operator Work |
7 |
Mr. Shyam Thakur |
S.K. |
Class IV |
Valve Operator Work |
8 |
Mr. Alik D’Souza |
S.K. |
Class IV |
Valve Operator Work |
9 |
Mr. Nelson Nigrel |
S.K. |
Class IV |
Valve Operator Work |
10 |
Mr. Pannalal Shripat Yadav |
S.K. |
Class IV |
Valve Operator Work |
11 |
Mr. Kiran Gaikwad |
S.K. |
Class IV |
Valve Operator Work |
12 |
Mr. Vinayak Patil |
S.K. |
Class IV |
Valve Operator Work |
13 |
Mr. Novol Machado |
S.K. |
Class IV |
Valve Operator Work |
14 |
Mr. Vilas Gaikwad |
S.K. |
Class IV |
Valve Operator Work |
15 |
Mr. Mrugavel Aadhimulam |
S.K. |
Class IV |
Valve Operator Work |
16 |
Mr. Anthony Kanwadar |
S.K. |
Class IV |
Valve Operator Work |
17 |
Mr. Amit Hirve |
Laborer |
Class IV |
Valve Operator Work at Uttan |
18 |
Mr. Arunandan Chinnathambi |
S.K. |
Class IV |
Valve Operator Work at Uttan |
Squad No. 2 (Bhayander-West) |
||||
Sr. No. |
Officer/Employee Name |
Designation |
Category |
Nature of Work |
1 |
Shri Vinod More |
S.K. |
Class IV |
Valve Man Work |
2 |
Shri Thandapani Ayagan |
S.K. |
Class IV |
Labor Work |
3 |
Shri Kuppuswami Velyan |
S.K. |
Class IV |
Labor Work |
4 |
Shri Ganesh Nandesan |
S.K. |
Class IV |
Labor Work |
5 |
Shri Selvaraj Shingodan |
S.K. |
Class IV |
Valve Man Work |
6 |
Shri Chhallan Viran |
S.K. |
Class IV |
Valve Man Work |
7 |
Shri Trimurti Kalyan |
S.K. |
Class IV |
Valve Man Work |
8 |
Shri Dagadu Soma Bagul |
S.K. |
Class IV |
Valve Man Work |
9 |
Shri Gurudutt Mhatre |
S.K. |
Class IV |
Valve Man Work |
10 |
Shri Henry Kafriya |
S.K. |
Class IV |
Valve Man Work |
11 |
Shri Pradip Marle |
S.K. |
Class IV |
Valve Man Work |
12 |
Shri Hasmukh Solanki |
S.K. |
Class IV |
Valve Man Work |
13 |
Shri Shashikant Taravi |
S.K. |
Class IV |
Valve Man Work |
14 |
Shri Arjun Gaikwad |
S.K. |
Class IV |
Frequently Absent |
15 |
Shri Shantaram Patil |
S.K. |
Class IV |
Valve Man Work |
16 |
Shri Chetan Solanki |
S.K. |
Class IV |
Valve Man Work |
17 |
Shri Sainath Waghmare |
S.K. |
Class IV |
Valve Man Work |
18 |
Shri Kishor Patil |
S.K. |
Class IV |
Valve Man Work |
19 |
Shri Arumani Subrayan |
S.K. |
Class IV |
Plumber Work |
20 |
Shri Vilas Wangad |
S.K. |
Class IV |
Valve Man Work |
21 |
Shri Dattaprasad Patil |
S.K. |
Class IV |
Sewerage Work |
22 |
Shri Harichand Dumda |
S.K. |
Class IV |
Valve Man Work |
Squad No. 3 (Bhayander East) |
||||
Sr. No. |
Officer/Employee Name |
Designation |
Category |
Nature of Work |
1 |
Shri Kolanji Perumal |
S.K. |
Class IV |
Labor Work |
2 |
Shri Sanjay Ba. Shelar |
S.K. |
Class IV |
Labor Work |
3 |
Shri Arumugam Kannan |
S.K. |
Class IV |
Labor Work |
4 |
Shri Pradip Bhima Solki |
S.K. |
Class IV |
Labor Work |
5 |
Shri Vadivel Muniyan |
S.K. |
Class IV |
Labor Work |
6 |
Shri Raja Shrinivasan |
S.K. |
Class IV |
Valve Man Work |
7 |
Shri Devanand H. Patil |
S.K. |
Class IV |
Valve Man Work |
8 |
Shri David D'Silva |
S.K. |
Class IV |
Valve Man Work |
9 |
Shri Joseph Jabet |
S.K. |
Class IV |
Valve Man Work |
10 |
Shri Sheth Nadesan |
S.K. |
Class IV |
Valve Man Work |
11 |
Shri Kishor Mhatre |
S.K. |
Class IV |
Valve Man Work |
12 |
Shri Chandrashekhar Ammaswami |
S.K. |
Class IV |
Valve Man Work |
13 |
Shri Govind Swami Viramutt |
S.K. |
Class IV |
Cleaning Goddev Tank Area |
14 |
Shri Govind Swami Lakshman |
S.K. |
Class IV |
Labor Work |
15 |
Shri Bhalchandra Pendharkar |
S.K. |
Class IV |
Labor Work |
16 |
Shri Nidhi Chinnapan Kadiyan |
S.K. |
Class IV |
Labor Work |
17 |
Shri Bhagwan Tandel |
S.K. |
Class IV |
Valve Man Work |
18 |
Shri Narendra Tandel |
S.K. |
Class IV |
Valve Man Work |
19 |
Shri Shantaram Katale |
S.K. |
Class IV |
Valve Man Work |
20 |
Shri Sadanand Tandel |
S.K. |
Class IV |
Valve Man Work |
21 |
Shri Shekhar Raut |
S.K. |
Class IV |
Valve Man Work |
22 |
Shri Viran Gopal |
S.K. |
Class IV |
Valve Man Work |
23 |
Shri Krishna Mengal |
S.K. |
Class IV |
Valve Man Work |
24 |
Shri Prabhu Anthony |
S.K. |
Class IV |
Frequently Absent |
25 |
Shri Satyaraj Kolanji |
S.K. |
Class IV |
Valve Man Work |
26 |
Shri Mangal Ramu Nirguda |
S.K. |
Class IV |
Valve Man Work |
27 |
Shri Kishor Mangal Padir |
S.K. |
Class IV |
Valve Man Work |
28 |
Shri Santosh Sankhe |
S.K. |
Class IV |
Valve Man Work |
29 |
Shri Anil Sakat |
S.K. |
Class IV |
Valve Man Work |
30-39 |
Various |
Various |
Class IV |
Labor Work |
Squad No. 4 (Bhayander East) |
||||
Sr. No. |
Officer/Employee Name |
Designation |
Category |
Nature of Work |
1 |
Shri. Bhagwan Salve |
S.K. |
Fourth |
Mukadam Work |
2 |
Shri. Shivaji Mandage |
S.K. |
Fourth |
Mestri Work |
3 |
Shri. Dnyaneshwar Shelar |
S.K. |
Fourth |
Mukadam Work |
4 |
Shri. Mrigan Biman |
S.K. |
Fourth |
Labour Work |
5 |
Shri. Balya Chilya |
S.K. |
Fourth |
Labour Work |
6 |
Shri. Shekhar Laxman |
S.K. |
Fourth |
Labour Work |
7 |
Shri. Unnikumar Palani |
S.K. |
Fourth |
Labour Work |
8 |
Shri. Manoj Devrukhkar |
S.K. |
Fourth |
Valve Operator Work |
9 |
Shri. Murgesh Vardhan Naidu |
S.K. |
Fourth |
Valve Operator Work (Lodha Amenity) |
10 |
Shri. Chandrashekhar Bhoir |
S.K. |
Fourth |
Valve Operator Work |
11 |
Shri. Dattaram C. Shelar |
S.K. |
Fourth |
(Disabled) Khawaldar Work at Mira Water Tank |
12 |
Shri. Mahadev Mangela |
S.K. |
Fourth |
Labour Work |
13 |
Shri. Pramod J. Gharat |
S.K. |
Fourth |
Valve Operator Work |
14 |
Shri. Bhushan Ahire |
S.K. |
Fourth |
Valve Operator Work |
15 |
Shri. Vijay Patil |
S.K. |
Fourth |
Valve Operator Work |
16 |
Shri. Giridhar Mhatre |
S.K. |
Fourth |
Valve Operator Work |
17 |
Shri. Rajendra V. Patil |
S.K. |
Fourth |
Valve Operator Work |
18 |
Shri. Ajay Patil |
S.K. |
Fourth |
Valve Operator Work |
19 |
Shri. Barku Dangde |
S.K. |
Fourth |
Labour Work |
20 |
Shri. Bhagwan Mankar |
S.K. |
Fourth |
Labour Work |
21 |
Shri. Phulbadan Yadav |
S.K. |
Fourth |
Labour Work |
22 |
Shri. Balu Namdev Jadhav |
S.K. |
Fourth |
Valve Operator Work |
23 |
Shri. Shashikant Thakur |
S.K. |
Fourth |
Valve Operator Work |
24 |
Shri. Madhukar Suryavanshi |
S.K. |
Fourth |
Valve Operator Work |
25 |
Shri. Shankar Potdar |
S.K. |
Fourth |
Valve Operator Work |
26 |
Shri. Janardan Patil |
S.K. |
Fourth |
Valve Operator Work |
27 |
Shri. Bhalchandra B. Patil |
S.K. |
Fourth |
Valve Operator Work |
28 |
Shri. Madhukar Sonawane |
S.K. |
Fourth |
Valve Operator Work |
29 |
Shri. Pyarelal Srivastava |
S.K. |
Fourth |
Valve Operator Work |
30 |
Shri. Vasudev Dhange |
S.K. |
Fourth |
Valve Operator Work |
31 |
Shri. Sanjay Khare |
S.K. |
Fourth |
Valve Operator Work |
32 |
Shri. Bhaskar Kisan Tribhuvan |
S.K. |
Fourth |
Valve Operator Work |
33 |
Shri. Jaywant Tukaram Thombre |
S.K. |
Fourth |
Valve Operator Work |
34 |
Shri. Avinash Thima Thombre |
S.K. |
Fourth |
Valve Operator Work |
35 |
Shri. Pravin Jadhav |
S.K. |
Fourth |
Valve Operator Work |
36 |
Shri. Dinesh Vishe |
S.K. |
Fourth |
Valve Operator Work |
37 |
Shri. Dinesh Ugda |
S.K. |
Fourth |
Valve Operator Work |
Squad No. 5 (Kankiya) |
||||
Sr. No. |
Officer/Employee Name |
Designation |
Category |
Nature of Work |
1 |
Shri. Sanjay Sonawane |
Mestri |
Fourth |
Mukadam Work |
2 |
Shri. Pandhari Nagare |
S.K. |
Fourth |
Mukadam Work |
3 |
Shri. Pravin Salve |
S.K. |
Fourth |
Mestri Work |
4 |
Shri. Krishna Tawate |
S.K. |
Fourth |
Mukadam Work |
5 |
Shri. Mudali Tangavel |
S.K. |
Fourth |
Labour Work |
6 |
Shri. Novel Nunes |
S.K. |
Fourth |
Valve Operator Work |
7 |
Shri. Rayappan Ranganathan |
S.K. |
Fourth |
Labour Work |
8 |
Shri. Arnasal Muttan |
S.K. |
Fourth |
Labour Work |
9 |
Shri. Sandeep Ishwar Tak |
S.K. |
Fourth |
Valve Operator Work |
10 |
Shri. Farukh Memon |
S.K. |
Fourth |
Mukadam Work |
11 |
Shri. Ramesh Rathod |
Labour |
Fourth |
Labour Work / Valve Operator Work |
12 |
Shri. Vilas Tele |
S.K. Labour |
Fourth |
Valve Operator Work |
13 |
Shri. Ganesh Tangadi |
S.K. Labour |
Fourth |
Valve Operator Work |
14 |
Shri. Jitendra Patil |
S.K. Labour |
Fourth |
Valve Operator Work |
15 |
Shri. Krishna Motiram Jadhav |
S.K. Labour |
Fourth |
Valve Operator Work |
16 |
Shri. Jagan Pawar |
S.K. Labour |
Fourth |
Valve Operator Work |
17 |
Shri. Mahadev Otavkar |
S.K. Labour |
Fourth |
Valve Operator Work |
18 |
Shri. Sunil Suresh Jadhav |
S.K. Labour |
Fourth |
Valve Operator Work |
19 |
Shri. Pannanivel Padiyachi |
S.K. Labour |
Fourth |
Valve Operator Work |
20 |
Shri. Ramesh Bhoye |
Labour |
Fourth |
Labour Work |
21 |
Shri. Hemant Harwate |
S.K. Labour |
Fourth |
Valve Operator Work |
22 |
Shri. Mohan Talpe |
Labour |
Fourth |
Frequently Absent |
23 |
Shri. Yogesh Karvande |
Peon |
Fourth |
Valve Operator Work |
24 |
Shri. Royal Periyanu |
Fitter |
Fourth |
Fitter Work |
Budget and expenditure details |
|||
Sr. No. |
Budget Head / Item Description |
Provision (₹ in '000) |
Expenditure (₹ in '000) |
1 |
Water Bill |
7400 |
5784.9 |
2 |
Permanent Establishment |
- |
- |
3 |
Temporary Establishment |
- |
- |
4 |
Travel Allowance / Training Fees |
1 |
- |
5 |
Printing Expenses |
10 |
- |
6 |
Distribution, Minor Purchases, Repairs & Labor Supply |
1000 |
681.27 |
7 |
TCL Powder & Chlorine Gas |
80 |
16.42 |
8 |
Property Maintenance & Repairs |
100 |
8.92 |
9 |
Pumping Station – Minor Purchases & Repairs |
1000 |
298.08 |
11 |
Cleaning & Repairs – Lakes & Wells |
50 |
- |
12 |
Pumping & Pump House Electricity Bill |
850 |
940.43 |
13 |
Tanker Rent |
250 |
94.15 |
14 |
Publication of Notices |
5 |
- |
15 |
Flow Meter / Valve Installation & Repair |
200 |
32.35 |
16 |
Painting at Water Tanks & STP Premises |
50 |
55.71 |
17 |
Water Supply – Safai Mitra Safety Campaign |
50 |
13.96 |
18 |
Construction of New Sewage Treatment Plant (STP) |
200 |
- |
19 |
STP Maintenance & Repairs |
2050 |
813.59 |
20 |
STP Electricity Bill |
400 |
291.03 |
22 |
Material Purchase (Borewells, Electrical Pumps, etc.) |
260 |
138.5 |
23 |
Laying of New Water Pipeline |
1400 |
79.08 |
27 |
Borewell / Tube Well Construction |
50 |
- |
28 |
Construction – Water Tank / Building / Meter Workshop |
150 |
- |
29 |
Installation of Pump – Kamala Park |
200 |
- |
30 |
Rainwater Harvesting Scheme |
75 |
- |
31 |
Purchase of Sewer Suction Machine |
160 |
- |
32 |
Capacity Enhancement – Saket Pump House |
170 |
- |
33 |
Laying of New Sewer Line |
75 |
- |
34 (a) |
AMRUT / Nagarothhan Scheme – Govt. Grant |
9043 |
13333.39 |
34 (b) |
AMRUT / Nagarothhan Scheme – Corporation Share / Loan |
1800 |
- |
35 (a) |
Sewerage Project Phase 2 – Govt. Grant |
2454 |
4334.24 |
35 (b) |
Sewerage Project Phase 2 – Corporation Share / Loan |
935 |
9.48 |
List of CFC centers |
|||
Sr. No. |
Ward / Division Name |
Office Address |
Contact Number |
1 |
Bhayander (West) – Ward G.H |
Main Office, Mira Bhayander Municipal Corporation, Bhayander (West) |
28140002 |
2 |
Bhayander (East) – Wards I, J, K, M |
Ward Office, Bhayander (East), Municipal School Building, Talao Road, Kharigaon |
28162376 |
3 |
Mira Road – Wards N, O, Z |
Ward Committee Office No. 05, Reservation No. 178, Samaj Mandir (Community Hall), near Dr. A.P.J. Abdul Kalam Udyan, Haidari Chowk, Naya Nagar, Mira Road (East) |
28103101 |
4 |
Mira Division – Wards P, Q, R |
Ward Committee Office No. 06, behind Kashimira Police Station, National Highway No. 8, Kashimira |
28454023 |
5 |
Kashi Division – Ward S |
Ward Committee Office No. 06, behind Kashimira Police Station, National Highway No. 8, Kashimira |
28454023 |
6 |
Kanakia Division – Ward T, F |
Swargiya Vilasrao Deshmukh Bhavan, Jangid Enclave, Kanakia Road, Mira Road (East) |
28113101 |
7 |
Ghodbunder Division – Ward T, F |
Near Shiv Sena Shakha, Retibandar Road, Ghodbunder, Mira Road (East), District – Thane |
- |
8 |
Chene Versova Division – Ward U, V |
Near Municipal School, Chene |
- |
9 |
Rai-Murdhe Division – Ward E |
Beside Ram Mandir, Murdha |
28144793 |
10 |
Dongri Division – Wards C, D, X |
Division Office, Dongri |
28452448 |
11 |
Uttan Division – Wards A, B |
Division Office, Uttan |
28452383 |
💧 Augmented Main Water Pipeline and Distribution System under Surya Regional Water Supply Scheme |
// Brief Note // |
To meet Mira Bhayandar Municipal Corporation's water demand until 2054, the Government has approved a reservation of 218 MLD (Million Liters per Day) water from the Surya Dam Project for Mira Bhayandar city. To deliver this 218 MLD of water to Mira Bhayandar, the Mumbai Metropolitan Region Development Authority (MMRDA) is implementing a 403 MLD Water Supply Scheme for both Mira Bhayandar and Vasai-Virar Municipal Corporations. MMRDA plans to commence water supply to the city through this scheme. Mira Bhayandar Municipal Corporation will carry out the work of bringing the 218 MLD water received at the balancing tank in Chene to Mira Bhayandar, laying the internal distribution network, and constructing elevated water tanks. |
✅ Main Components of the Scheme: |
Construction of 23 elevated water storage tanks, including: 1 Ground Service Reservoir (GSR) 1 Pure Water Sump Laying of 41 km of Feeder/Transmission mains Laying of 176 km of internal distribution pipelines |
🏛 Administrative & Financial Details: |
The project has been administratively approved at a cost of ₹516.78 Cr as per Government Resolution AMRUT-2022/No. 268/Navi-33 dated 02/11/2022. After completing the tender process, the work order was issued to Eagle Infra India Ltd. on 30/06/2023. |
💰 Financial Structure (Administrative Approval ₹516.78 Cr): |
||
Source of Funding |
Share (%) |
Amount (₹ Cr) |
Central Government Grant |
33.33% |
₹172.24 Cr |
State Government Grant |
36.67% |
₹189.50 Cr |
Municipal Corporation Share |
30% |
₹155.04 Cr |
Funds Received: ₹216 Cr |
||
Expenditure Incurred (up to 10th running bill): ₹236.53 Cr |
📄 Tender Details: |
Estimated Cost: ₹423.54 Cr Approved Tender Cost: ₹559.15 Cr (Including GST)
|
🚧 Current Status of Work: |
|||
Out of 23 water tanks, construction of 20 tanks is in progress Total Piles Required: 1618 Piles Completed: 1337 Work yet to commence at 3 locations:
Raigaon Reservation No. 170 (Payyade Hotel Road) Goddev Pipe supply and laying work is also underway.
|
|||
· |
· Tender Qty |
· Supply Qty |
· Laying Qty |
· DI Pipes |
· 185 km |
· 172 km |
· 71 km |
· MS Pipes |
· 32 km |
· 30 km |
· 7.5 km |
🚧 Laying of Water Pipeline Using Trenchless Technology |
A 1700 mm diameter water pipeline is being laid from Chene MBR to Delhi Darbar. This pipeline will enable the supply of approximately 70 MLD of water through the existing distribution system. The work has commenced from the toll plaza to Delhi Darbar, and as of now, approximately 2.7 km of pipeline laying has been completed. The remaining stretch of about 180 meters from Delhi Darbar to Western Hotel is pending due to the National Highway Authority's permission. |
📊 Overall Progress of the Work: |
Financial Progress: 42.21% Physical Progress: 51.22% |
Notable Achievements of the Department in the Financial Year 2023–2024 |
Augmented Main Water Pipelines and Distribution System Based on the Surya Regional Water Supply Scheme |
To meet the water demand of Mira Bhayandar city until the year 2054, the government has approved a reservation of 218 MLD (Million Liters per Day) of water from the Surya Dam Project for Mira Bhayandar. To deliver this reserved 218 MLD of water to the city, the Mumbai Metropolitan Region Development Authority (MMRDA) is implementing a 403 MLD regional water supply scheme for both Mira Bhayandar and Vasai-Virar Municipal Corporations. Water supply from this scheme was expected to commence by April 2023. The water arriving at the balancing tank at Chene (as part of this scheme) is to be further conveyed into the Mira Bhayandar city. The related works, such as laying the internal distribution network and constructing elevated water storage tanks, are being executed by the Mira Bhayandar Municipal Corporation. The revised Detailed Project Report (DPR), with a cost of ₹516.78 crore, has been approved as per Government Resolution No. AMRUT-2022/PR No. 268/Navi-33 dated 02/11/2022, and the contractor has been issued the work order. |
Current Status of the Project Work |
As of now, a total of 53.26 kilometers of pipelines of various diameters have been laid across Mira Bhayandar city. Construction work is underway for 12 out of the proposed 23 water tanks. Once the project is completed, the water scarcity issues in the Mira Bhayandar Municipal Corporation area will be resolved permanently.
|
Estimated provision and Exprnditure for the year 2023-24 |
|||
A. No. |
Head of Account |
Provision |
Expenditure |
1 |
Water bill |
7400 |
5784.9 |
2 |
permanent establishment |
- |
- |
3 |
temporary establishment |
- |
- |
4 |
Travel Allowance / Training Fee |
1 |
- |
5 |
Printing expenses |
10 |
- |
6 |
Distribution system and retail purchase / repair / labor supply |
1000 |
681.27 |
7 |
Tea . C . l . powder and chlorine gas |
80 |
16.42 |
8 |
Property maintenance and repairs |
100 |
8.92 |
9 |
Pumping station retail purchase / repair |
1000 |
298.08 |
11 |
Pond , well repair / cleaning |
50 |
- |
12 |
Pumping and pump house electricity bill |
850 |
940.43 |
13 |
tanker hire |
250 |
94.15 |
14 |
to publish the information |
5 |
- |
15 |
Flow meter / vag make valve installation / repair |
200 |
32.35 |
16 |
Painting the premises of the water tank and sewage treatment plant |
50 |
55.71 |
17 |
Water Supply Cleaning Mitra Safety Campaign |
50 |
13.96 |
18 |
Navin Malani : Raising the Saran Centre |
200 |
- |
19 |
Malani : Saran Center Maintenance / Repairs |
2050 |
813.59 |
20 |
Malni : Saran Kendra electricity bill |
400 |
291.03 |
22 |
Purchase of materials ( fuel , electric pumps , materials ) |
260 |
138.5 |
23 |
Laying a new water pipe |
1400 |
79.08 |
27 |
Construction of a borehole / well |
50 |
|
28 |
Water tank / Building construction / Meter workshop |
150 |
- |
29 |
Setting up a water pump at Kamala Park |
200 |
- |
30 |
Rain water harvesting scheme |
75 |
- |
31 |
Sewer Sucker Machine Purchase |
160 |
- |
32 |
Increasing the capacity of Saket pump house |
170 |
- |
33 |
To throw in new garbage |
75 |
- |
34 |
Amrit Yojana / Urban Renewal Mission a) Government Grant b ) Municipal Share / Loan |
9043.00/1800.00 |
13333.39 |
35 |
Sewage : Saran Project Phase -2 a ) Government Grant b ) Municipal Share / Loan |
2454.00..935.00 |
4334.24..9.48 |
Register of work orders for the year 2023-24 |
||||
No. |
Job Title |
Contractor |
Amount (INR) |
Work Order No. & Date |
1 |
Technical Consultant for Safai Mitra Challenge / Majhi Vasundhara |
C.E.G.P. Foundation |
9,95,000 |
Papu/Works/01/23-24, Dt. 06/04/23 |
2 |
Materials for Lab at Sewage No. 2, 6B, 6C |
Harsh Enterprises |
4,23,729 |
Public Works/02/23-24, Dt. 06/04/23 |
3 |
Materials for Lab at Sewage No. 4, 5, 8 |
Harsh Enterprises |
4,23,729 |
Papu/Work/03/23-24, Dt. 06/04/23 |
4 |
Furniture for Lab at Sewage No. 2, 6B, 6C |
Shri Ganesh Enterprises |
4,58,455 |
Papu/Works/04/23-24, Dt. 21/04/23 |
5 |
Furniture for Lab at Sewage No. 4, 5, 8 |
Shri Ganesh Enterprises |
4,58,455 |
Papu/Work/05/23-24, Dt. 21/04/23 |
6 |
Laying 500mm Water Pipe – Shastri Nagar |
S.M. Developers |
50,80,791 |
Papu/Work/06/23-24, Dt. 15/05/23 |
7 |
Cleaning Public Wells – Ward 01 |
Omkar Enterprises |
21,06,764 |
Papu/Work/07/23-24, Dt. 18/05/23 |
8 |
Cleaning Public Wells – Ward 02-06 |
Omkar Enterprises |
20,98,468 |
Papu/Work/08/23-24, Dt. 18/05/23 |
9 |
Annual STP Maintenance (5 D.L.Ltd. Capacity) |
S.S. Envoyro Sales & Services |
28,42,860 |
Papu/Work/09/23-24, Dt. 01/06/23 |
10 |
Soundproofing – STP 6B |
Metal Messanica Fracasso |
1,07,91,458 |
Papu/Works/10/23-24, Dt. 02/06/23 |
11 |
Painting Lab – STP 2,4,5,6C,7,8 |
Shri Enterprises |
8,41,060 |
Papu/Works/11/23-24, Dt. 05/06/23 |
12 |
Painting Walls – STP 2,4,5,6A |
Shri Enterprises |
8,46,838 |
Papu/Works/12/23-24, Dt. 05/06/23 |
13 |
Painting Walls – STP 6B, 6C, 8 |
Shri Enterprises |
8,19,056 |
Papu/Works/13/23-24, Dt. 05/06/23 |
14 |
AC Installation – STP 2,4,6A,6C |
Siddha Civil Law |
3,20,720 |
Papu/Works/14/23-24, Dt. 07/06/23 |
15 |
Water Pipeline – Jasmine Apt. to Kushal |
Siddha Civil Law |
7,05,435 |
Papu/Works/15/23-24, Dt. 07/06/23 |
16 |
Painting – Kashi & Miragaon Jalkumbh |
Aradhya Enterprises |
8,41,953 |
Papu/Works/16/23-24, Dt. 07/06/23 |
17 |
Painting – Kanakia Water Tank |
Aradhya Enterprises |
4,43,146 |
Papu/Works/17/23-24, Dt. 07/06/23 |
18 |
Rainwater Harvesting – Udyan Projects |
Tendulkar Enterprises |
8,44,501 |
Papu/Works/18/23-24, Dt. 15/06/23 |
19 |
Sewerage Phase-2 (Part-1) |
S.M.C. Infra Ltd. |
1,47,05,59,013 |
Papu/Works/19/23-24, Dt. 28/06/23 |
20 |
Water System Extension (Surya Scheme) |
Eagle Infra India Ltd. |
4,23,54,37,231 |
Papu/Works/20/23-24, Dt. 30/06/23 |
21 |
Feeder Water Channel Maintenance |
Sandesh Butala |
1,27,52,105 |
Papu/Works/21/23-24, Dt. 01/08/23 |
22 |
Pipeline Work – Shanti Garden to Shanti Vihar |
Siddha Civil Law |
3,15,494 |
Papu/Works/22/23-24, Dt. 17/08/23 |
23 |
Pipeline Connection – Bhairav to Old Kashi Water Tank |
Siddha Civil Law |
6,14,119 |
Papu/Works/23/23-24, Dt. 17/08/23 |
24 |
Footpath Channel Work – Dhanukarwadi |
Siddha Civil Law |
8,47,649 |
Papu/Works/24/23-24, Dt. 17/08/23 |
25 |
Drainage Channel Work – Ganesh Deval to Samta Nagar |
Siddha Civil Law |
8,47,649 |
Papu/Works/25/23-24, Dt. 17/08/23 |
26 |
Footpath & Drainage Work – Hatkesh |
Siddha Civil Law |
8,47,649 |
Papu/Works/26/23-24, Dt. 17/08/23 |
27 |
Pavement & Water Drain – Indralok |
Siddha Civil Law |
7,44,308 |
Papu/Works/27/23-24, Dt. 17/08/23 |
28 |
HDPE Pipe Work – Salasar Nagar |
Siddha Civil Law |
6,44,865 |
Papu/Works/28/23-24, Dt. 17/08/23 |
29 |
Pipeline Work – Shanti Garden |
Siddha Civil Law |
8,44,865 |
Papu/Works/29/23-24, Dt. 17/08/23 |
30 |
Pipeline Work – Shanti Nagar to Krishna Vihar |
Siddha Civil Law |
8,44,865 |
Papu/Works/30/23-24, Dt. 17/08/23 |
31 |
Road, Footpath & Drainage – Hatkesh |
Siddha Civil Law |
7,64,951 |
Papu/Works/31/23-24, Dt. 17/08/23 |
32 |
Footpath & Drainage – Bhaji Mandai |
Siddha Civil Law |
8,39,881 |
Papu/Works/32/23-24, Dt. 17/08/23 |
33 |
Pavement Channel – Near Naya Nagar Bus Depot |
Siddha Civil Law |
6,44,865 |
Papu/Works/33/23-24, Dt. 17/08/23 |
34 |
Repair – Shubh Ashish, Salasar Nagar |
Siddha Civil Law |
4,57,098 |
Papu/Works/34/23-24, Dt. 17/08/23 |
35 |
Rainwater Drainage – Navghar Vasti |
Siddha Civil Law |
5,62,708 |
Papu/Works/35/23-24, Dt. 17/08/23 |
36 |
Drainage Work – Opp. Suryadarshan Society |
Siddha Civil Law |
6,23,831 |
Papu/Works/36/23-24, Dt. 17/08/23 |
37 |
Repair – Gayatri Dham, Shanti Nagar |
Siddha Civil Law |
8,44,865 |
Papu/Works/37/23-24, Dt. 17/08/23 |
38 |
Drainage Repair – NR Complex, Hatkesh |
Siddha Civil Law |
6,63,393 |
Papu/Works/38/23-24, Dt. 17/08/23 |
39 |
Footpath Repair – Cross Garden |
Siddha Civil Law |
5,60,939 |
Papu/Works/39/23-24, Dt. 17/08/23 |
40 |
Footpath Repair – Manas Complex |
Siddha Civil Law |
4,73,610 |
Papu/Works/40/23-24, Dt. 17/08/23 |
41 |
Road Work – Opp. Saraswati Hospital |
Siddha Civil Law |
6,29,757 |
Papu/Works/41/23-24, Dt. 17/08/23 |
42 |
Footpath Channel – Gayatri Dham |
Siddha Civil Law |
5,18,254 |
Papu/Works/42/23-24, Dt. 17/08/23 |
43 |
Channel Work – Galaxy Heights to Lodha |
Siddha Civil Law |
4,59,135 |
Papu/Works/43/23-24, Dt. 17/08/23 |
44 |
Channel & Path Work – Kashimira |
Siddha Civil Law |
5,42,881 |
Papu/Works/44/23-24, Dt. 17/08/23 |
45 |
Road & Path Work – Salasar Nagar |
Siddha Civil Law |
6,32,183 |
Papu/Works/45/23-24, Dt. 17/08/23 |
46 |
Road Work – Near Vrindavan Society |
Siddha Civil Law |
4,65,595 |
Papu/Works/46/23-24, Dt. 17/08/23 |
47 |
Drainage & Road Work – Sheetal Nagar |
Siddha Civil Law |
5,42,881 |
Papu/Works/47/23-24, Dt. 17/08/23 |
48 |
Drainage Work – Saibaba Nagar |
Siddha Civil Law |
4,95,254 |
Papu/Works/48/23-24, Dt. 17/08/23 |
49 |
Road Work – Opp. NR Complex |
Siddha Civil Law |
3,54,797 |
Papu/Works/49/23-24, Dt. 17/08/23 |
50 |
Pavement & Channel – Golden Nest Phase 3 |
Siddha Civil Law |
3,51,186 |
Papu/Works/50/23-24, Dt. 17/08/23 |
51 |
Road Repair – Near Ramdev Park |
Siddha Civil Law |
4,67,797 |
Papu/Works/51/23-24, Dt. 17/08/23 |
52 |
Pavement & Drainage – Near Lodha Splendora |
Siddha Civil Law |
6,44,865 |
Papu/Works/52/23-24, Dt. 17/08/23 |
53 |
Road Work – Opp. RBK School |
Siddha Civil Law |
4,57,098 |
Papu/Works/53/23-24, Dt. 17/08/23 |
Right to Information Statement Form No. 2D |
|||||||||
Statement showing details of information applications received at the Municipal Corporation level from janeuvari 2024 to Dicembar 2024 |
|||||||||
A. No. |
Name of the Municipal Corporation |
Revised number of pending applications as of the end of December 2023 |
Number of applications received this year 2024 |
Total Information Request ( Coloumn No. 3+4) |
Number of applications disposed of this year 2024 |
Applications Disposed |
By the end of this year 2024 |
Amount collected for information provided during the reporting period Rs . |
|
Number of pending applications |
|||||||||
Number of applications for which information was provided |
Information on the number of applications rejected ( S. No. 6-7 ) |
(And. No. 5-6) |
|||||||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
1 |
Water Supply Department |
6 |
135 |
140 |
135 |
135 |
Absolute |
5 |
- |
Various Initiatives :- |
To ensure a clean water supply to the citizens of Mira-Bhayander city, a work order has been issued for the technical cleaning of elevated water tanks, and the cleaning work of these elevated tanks has been initiated. For the daily water usage needs of the citizens, a work order has been issued for the cleaning and repair of public wells in Mira-Bhayander city. The cleaning and repair work of these wells has been started. To provide water connections through a new online approval system and to enable prompt action on citizens’ complaints and applications, the RTS (Right to Service) online service has been launched in the Mira-Bhayander city. To provide a 24/7 water supply to the citizens, a work order has been issued for the 21.8 MLD Surya Project Water Supply Scheme, and the work is currently in progress. To supply water to citizens via tankers in times of need, an online system for water tanker supply has been initiated. Under the Underground Sewerage Scheme Phase-2 (Part-1) in Mira-Bhayander city, a work order has been issued to construct a sewage treatment plant with a capacity of 4.8 MLD, and the work is in progress. Under the Underground Sewerage Scheme Phase-2 (Part-2) in Mira-Bhayander city, the tender process is underway for constructing one sewage treatment plant and carrying out gap work across the city. |
Departmental Payments:- |
Order :- |
>> Order_433 regarding the appointment of security personnel at the water tanks and pumping stations under the jurisdiction of the Water Supply and Sewerage Department |